On December 2, 2014, the Gulfport City Council approved the funding for a $20 Million bond issue for the City of Gulfport. The projects that were funded are related to Water, Sewer, Streets, Bridges, Drainage, Equipment, and Leisure Services. These systems are in need of improvements and this funding priority is based on master plans determined by the Mayor, City Council, and Department Heads. Coordinating replacement and improvement of the City’s infrastructure, including water distribution, sewage collection, storm drainage systems, and all sewage pumping stations is a challenging task. Gulfport’s Engineering Department will serve as the Project Managers for the Bond Projects. Private Engineering Firms will be hired to design and oversee the construction projects. The goal is to have these projects constructed by December, 2016.

The City of Gulfport is excited to announce the investment into the infrastructure that affects Gulfport’s residents, business owners, agencies, and other governments. Improving the day to day services that enhance the life of each person will be the result.

2014 BOND ISSUE PROJECTS

FY 2014 General Fund Projects:      
Project No.
Type
Ward
Project Description
Total Project Cost 
Status 
1
Bridge
6
$650,000
2
Drainage
3
$100,000
3
Drainage
5
$200,000
4
Drainage
5
$100,000
5
Paving
3
$200,000
6
Drainage
1,3
$1,000,000
7
Street
6
$180,000
8
Drainage
2
$75,000
9
Culvert
3
$100,000
10
Drainage
2,3
$300,000
11
Drainage
2
$250,000
12
Drainage
3,4
$250,000
13
Drainage
All
EPA Stormwater Phase 2 Projects
14
Street
4
$95,000
15
L.S.
All
Leisure Services Projects
16
Street
7
$125,000
17
Street
5
$125,000
18
Street
All
ADA Compliance Projects
19
Drainage
7
$200,000
20
Misc.
All
General Fund
$500,000
21
P.W.
All
Capital Equipment
$1,000,000
22
Drainage
7
$200,000
FY 2014 Water & Sewer Projects:      
Project No. 
Type
Ward
Project Description
Total Project Cost 
Status
1-1
Water
4
$ 2,071,700.00
1-2
Water
4
$ 873,787.50
Sewer
7
$ 800,000.00
Sewer
1,3
$ 300,000.00
Sewer
4
$ 545,915.00
1-24
Water
1
$ 1,728,001.25
1-24
Water
1
$ 1,728,001.25
1-8
Water
6
$ 1,647,058.75
Sewer
all
$ 1,196,093.75
1-1
Sewer
4
$ 882,100.00
1-2
Sewer
4
$ 1,388,825.00
2-1
Sewer
7
$ 688,517.50
Paving
6
$ 150,000.00
2-29B
Sewer
7
$ 850,000.00
 
Sewer
  Three Rivers from O’Neal Road to Duckworth Gravity Sewer & Old Highway 49 and Orange Grove Road Gravity Sewer -  
      Improvements to Canal Road from Landon Rd. to I-10 -  
Public Works Projects:
   
Type
Ward
Project Description
Total Cost
Status
 
Culvert
3
$100,000
 
Drainage
2
$249,000
 
Drainage
2
$200,000
 
Drainage
5
$200,000
 
Drainage
2
$75,000
 
Drainage
3
$100,000
 
Drainage
5
$100,000
 
Sewer
6
$1,383,206
 
Sewer
7
Hwy 49 Orange Grove Rehabilitation & South Swan/Three Rivers Sewer
$1,500,000
 
Sewer
  Laurelwood Dr. Sullivan LN., and Duckworth Rd./Twin Dr. Sewer Improvements  
 
Sewer
  Forrest Heights Sewer System Assignment Assistance  
 
Sewer
7
Three Rivers from O’Neal to Duckworth Gravity Sewer and Old Hwy 49 & Orange Grove Road Gravity Sewer Design  
 
Street
1 & 3
$545,000
 
Street
4
$95,000
 
Street
7
$125,000
 
Street
4
$262,611
 
Street
5
$2,991,742
 
Street
1-4
$554,000
Street
6-7

 

 

Home | Government | Business | Visitors | Residents | Online Services | Contacts
The City of Gulfport | P.O. Box 1780 Gulfport, MS 39502 | (228) 868-5700
"We're open for business and geared for a good time!"

Gulfport Showcase